In2Track3

Research into optimised and future railway infrastructure

Menu Skip to content
  • HOME
  • NEWS AND EVENTS
    • SOCIAL MEDIA
    • WP1 Enhanced S&C
    • WP2 Next Generation S&C
    • WP3 Enhanced track
    • WP4 Next Generation track
    • WP5 Tunnels and bridges
    • WP6 Project management
    • WP7 Technical coordination
    • WP8 Diss, Expl, Comm
    • LATEST UPDATES
  • THE PROJECT
    • OBJECTIVES
    • PROJECT STRUCTURE
    • WORK PACKAGES
  • PARTNERS
  • RESULTS AND PUBLICATIONS

Author: Pernilla P2

November 21, 2022November 21, 2022 Pernilla P2

3MB The Movie

October 10, 2022 Pernilla P2

Virtual Vehicle improving maintenance through holistic track damage analysis

October 6, 2022October 17, 2022 Pernilla P2

Presentations Mid-term

October 3, 2022October 3, 2022 Pernilla P2

In2Track3 Mid-term event

September 22, 2022September 22, 2022 Pernilla P2

In2Track3 Smart Material at InnoTrans

September 19, 2022September 19, 2022 Pernilla P2

3MB and the work on transition zones

September 16, 2022 Pernilla P2

The 3MB is installed!

September 5, 2022September 19, 2022 Pernilla P2

Demonstrator for the Turnout S&C design

July 15, 2022September 16, 2022 Pernilla P2

Tunnel Substructure Investigation Radar (TSIR)

June 18, 2022September 9, 2022 Pernilla P2

WP1 team gathered in Göteborg

Posts navigation

Older posts

This website is an extension of the original website available at shift2rail.org.

Recent Posts

  • Upgrading the regulations for bridge constructions January 16, 2023
  • Rail maintenance made easy with the EMAT December 6, 2022
  • Remote underwater inspections of rail constructions improve safety December 5, 2022
  • 3MB The Movie November 21, 2022
  • Virtual Vehicle improving maintenance through holistic track damage analysis October 10, 2022
Tweets by In2Track3
In2Track3
Proudly powered by WordPress Theme: Apostrophe 2.
 

Loading Comments...